On 13 September Eni, through its Mellitah Oil & Gas joint venture with Libya’s National Oil Corporation (NOC), launched prequalification for front end engineering and design (FEED) for development of Block NC-41’s ‘Structure A’ as well as upgrade and expansion of its coastal Mellitah complex.
‘Structure A’ development will involve the construction of an offshore platform and eight subsea wells. The platform will be tied back to the Mellitah complex by two 79km pipelines – a 20” gas pipeline and an 8” condensate pipeline. (CONTINUED - 617 WORDS)