BP is preparing to bring online two additional wells on its North Damietta license in the Egyptian Mediterranean.
At both the 2017 Qattameya discovery in 108ms water depth MEES, 30 August 2019), and the Atoll-4 well drilled late last year (MEES, 13 December 2019) “preparation for production, engineering designs and manufacturing of the subsurface equipment have been completed, and will be installed by the end of October,” Mohamed Samir, head of BP’s Pharaonic Petroleum JV with EGPC this week told oil minister Tarek El Molla. (CONTINUED - 165 WORDS)